Exhibition build-up and breakdown must follow the venue’s access windows, organiser guidelines and approved design. Share the event schedule and site requirements early so installation and dismantling responsibilities can be clarified before the event.
Confirm venue access, move-in timings, booth location, approved drawings, material arrival, electrical and AV needs, contractor permissions and safety requirements.
The installation plan should clarify responsibilities, sequencing, checks and who approves changes. Any venue-specific permits, electrical work or specialist services should be confirmed before work begins.
Agree the breakdown window, material handling, storage or disposal arrangements and any reusable components. The exact service scope depends on venue rules and the approved quotation.
Availability depends on the event location, schedule, venue requirements and project scope. Share the details so the team can confirm serviceability.
Provide venue and hall details, booth number, approved drawings, move-in and move-out timings, organiser rules and contact details for the event coordinator.
No. Confirm whether dismantling, packing, transport, storage or disposal is included in the quotation before approving the project.
Share the event location, booth size, dates and project scope. The team can review the brief and confirm the next steps.